Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

June 16, 2025

No Information to Display

Multiple Locations

Renovation

No Information to Display

$183,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Lombard, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Gilbane Building Company, Construction Manager, for and acting on behalf Glenbard Township High School District 87 is receiving lump sum proposal forms from interested contractors for the Summer 2025 Capital Improvements at all four Township High Schools. The project at Glenbard East entails the installation of a new 8,500-square-foot curtain wall system, roof replacement, a refresh of the library, and the complete refurbishment of twelve general purpose and three science class rooms. The hard wood gym floor at Glenbard South will be refinished, bleachers will be replaced, 24 new windows will be installed, and 66,000 SF of the roof will be replaced. In addition, Glenbard West will replace over 120 windows, refinishing of the hard wood gym floor, installation of new bleachers, complete renovation of five science class rooms, and selective masonry tuck pointing. Three science rooms in Glen bard North will undergo complete renovations along with new punched windows. The science classrooms at both North and West will have Mechanical, Electrical, & Plumbing upgrades associated with that work. Bid Security in the form of a bid bond in an amount equal to ten percent (10%) of the base bid is required from all Bidders. No other forms of Bid Security will be accepted. Guarantee Bonds in the form of a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid may be required from the awarded Bidder. The work will be done in accordance with the Contract Documents. "FAILURE TO COMPLY WITH THE REQUIREMENTS OF THIS INVITATION TO BID WILL RESULT IN THE DISQUALIFICATION OFTHE BIDDER". This contract calls for the construction of a "public work," within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. ("the Act"). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the "prevailing rate of wages" (hourly cash wages plus fringe benefits) int he county where the work is performed. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website online. BID RELEASE 1 - BID PACK AGES BP# / Description 02A Demolition - East & South 02B Demolition - North & West 04A Masonry - East & South 04B Masonry - North & West 05A Structural Steel Framing 06A Carpentry and Sills/Gen Case work - East & South 06B Carpentry and Sills/Gen Case work - North & West 06C Lab Casework - North, West, & East 07A Roofing - East & South 07B Roofing - North & West 07C ACM Panel - East Only 08A Glass and Glazing - East & South 08B Glass and Glazing - North & West 08C Door Frames and Hardware 09A Drywall and Acoustics - East & South 09B Drywall and Acoustics - North & West 09C Resilient Flooring - East Only 09D Resilient Flooring - North & West 09E Paint 09F Gym Refinishing - West & South 11A Bleachers - West & South 21A Fire Protection 22A Plumbing 23A HVAC - North & West 26A Electrical and LV - North & West The Glenbard Township High School District 87 and Gilbane Building Company reserve the right to reject any or all bids. All information submitted as part of this process shall be considered public information under the State Freedom of Information Act unless specifically disclosed on the applicable information by the Bidder. Challenges to such exemptions shall be defended solely by the Bidder. Bidders who are not pre-qualified in accordance with this Advertisement will have their bids returned unopened. To bid this project, bidders must be qualified by Gilbane Building Company. The prequalification application is to be completed online via Compass at https://compass-app.com/auth/register. Questions regarding the prequalification application procedure should be directed to Yvonda Royster at 312-614-3913 or yroyster@gilbaneco.com. Although a firm timeline has not been confirmed, construction is not expected to start prior to Summer 2025.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.