Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 7, 2024

November 6, 2024

November 22, 2024

Multiple Locations

Renovation

No Information to Display

$20,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Richland, WA

40

6

Subscribe to View Full Documents

This project will install new electrical meters at six (6) PNNL facilities to provide enhanced power monitoring. The Scope of Work is as follows: In 3410, 3420 and 3430, demolish existing power meters on main incoming services and install new Battelle Furnished stand-alone meters on main incoming services. In 3820 and 3860: Install new Battelle Furnished stand-alone meters on main incoming services and existing meters are remaining in place. In 3850, demolish ATS and re-feed main switchboard directly from main breaker, and install new Battelle Furnished stand-alone meters on main incoming services The facilities addresses are as follows: - 3410 Material Science and Tech Laboratory, 622 Horn Rapids Rd, Richland, WA - 3420 Radiation Detection Laboratory, 638 Horn Rapids Rd, Richland, WA - 3430 Ultratrace Laboratory, 670 Horn Rapids Rd, Richland, WA - 3820 Systems Engineering Building, 820 Horn Rapids Rd, Richland, WA - 3850 General Purpose Chemistry Laboratory, 850 Horn Rapids Rd, Richland, WA - 3860 Engineering and Analysis Building, 860 Horn Rapids Rd, Richland, WA Inquiries: All inquiries shall be sent to: Christina.Ochs@pnnl.gov Requests for Clarification / Interpretation: If the Bidder finds discrepancies, omissions, or is in doubt as to the true meaning of any part of the contract documents, Bidder MUST submit a WRITTEN request for clarification or interpretation using Request for Information (RFI) form at online. and address it to the Contract Specialist listed on Page 1, no later than 2:00 p.m. PST; 10/1/2024.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.