Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

December 9, 2024

December 31, 2025

Multiple Locations

Site Work

No Information to Display

$900,000.00

Public - County

img_map_placeholder

Multiple Locations, Omaha, NE

112

17

Subscribe to View Full Documents

Work to be performed under this contract includes necessary relocations and/or improvements to sanitary sewer, water service, and power system infrastructure. Anticipated Notice to Proceed: December 9, 2024 LOCATION AND DESCRIPTION OF WORK A. The Streetcar Project consists of construction of a modern streetcar in the City of Omaha and extends from 40th Street to 10th Street along Farnam Street and from 31st Street to 10th Street along Harney Street. In addition, a loop extends from 10th Street to 8th Street and Capitol Avenue to Farnam Street. The Work under this Contract constitutes a portion of the overall Project and is located between 40 th Street and Turner Blvd along Farnam Street. B. Work to be performed under this Contract consists of improvements to the gravity sewer system and water main system including, but is not limited to, lining gravity sewers and service laterals, replacement of sewer manholes, installation of new or replacement gravity sewer at select locations, installation of new water distribution main, installation of new water transmission main at 38th Street, installation of new water services, hydrants, installation of new power duct bank and all other Work required in accordance with the Contract Documents. C. Contracting Method: The Project will be constructed under a single prime construction Contract.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.