Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2024

December 17, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$4,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Shrewsbury, MA

60

32

5

3

Subscribe to View Full Documents

The scope of work includes demolition of the existing electrical equipment, HV, pumps, piping, valves and controls; new wastewater pumps; new electrical equipment, new HV equipment, modifications to the instrumentation & control panels; new electrical wiring, conduit and panels, and appurtenant site work and grading at two pump station sites. Bid security for all general bidders and sub bidders in the form of a bid bond, cash, certified check, treasurer's or cashier's check, payable to the Owner, is required in the amount of 5 percent of the total bid. The selected contractor shall furnish a performance bond and a payment bond in amount at least equal to one hundred percent (100%) of the contract price. This project requires compliance with Massachusetts Diesel Retrofit Program [MDRP] by use of after-engine emission controls that are EPA certified, or their equivalent, on at least 100% of the off-road [non-registered] diesel vehicles/equipment used at the job site. General Contractors shall file their bids with a copy of the certificate from Division of Capital Asset Management and Maintenance (DCAMM) showing that they are eligible to bid on projects of this category, of this estimated project dollar amount and up to an aggregate limit, and with an Update Statement, DCAM Form CQ3]and Certificate of Eligibility, DCAM Form CQ7. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.20 percent D/MBE participation and 4.50 percent D/WBE participation by certified DBEs. The Owner reserves the right to waive any informalities in bids and to reject any or all bids Project No. ENG22-0015, 2024-PS03

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects