Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

November 11, 2024

December 16, 2024

7016 AL-129

Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

7016 AL-129, Winfield, AL

Our team is requesting plans for this project.

Subscribe to View Full Documents

The work of constructing the Winfield Pilot Travel Center Utilities Infrastructure Project will be let under one Contract. The principal items of work are detailed herein below. Principal Work: 1. Installation of Approximately 1,400 L.F. of 8" Waterline (Install Only) 2. Installation of Approximately 1,000 L.F. of 8" SDR 26 Gravity Sewer Line (Install Only) 3. Service Connections for Water and Sewer (Install Only) 4. Remove Approximately 100 L.F. of Existing 6" Carrier Pipe and Install Approximately 100 L.F. 8" Carrier Pipe Inside a 14" Casing Pipe. The Contractor is Hereby Advised That Time is of the Essence on This Project and That the Contract Time of 35 Consecutive Calendar Days and Noted Restrictions Shall Be Strictly Observed. Liquidated Damages Will Be Assessed if the Contract Time is Exceeded. The Contractor May Apply for an Extension of Time in Accordance With the Provisions of the Contract; However, Such an Extension Must Be Approved Prior to the Contract Completion Date to Avoid the Imposition of Liquidated Damages. There Will Be No Pre-bid Meeting. The successful bidder must furnish a Performance Bond for one hundred (100%) of the bid amount and a Payment Bond for one hundred (100%) percent of the bid amount, and must secure his bond from a bonding company's representative or agent in the State of Alabama. No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving Bids.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects