Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

December 2, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$1,827,500.00

Public - City

img_map_placeholder

Multiple Locations, Westminster, CA

37

5

2

Subscribe to View Full Documents

Playground Renovation for Bolsa Chica Park, Westminster Village Park, Bowling Green Park College Park, Russell C. Paris Park. Any questions regarding these specifications should be addressed to the Project Engineer, Cindy Huynh, at (714) 548-3497. The latest edition of the Standard Specifications for Public Works Construction (Green Book), including any supplements, is included by reference as a part of the Specifications for this project. The City of Westminster reserves the right to accept or reject any bids presented, to waive any irregularity and informality in the bids and bid process, and to retain all bids and guarantees for a period of sixty (60) days for examination and comparison, all as specified in the contract documents. At the time the bid is submitted, the Contractor shall possess a valid Class A or C Contractor's License. The bidder must also submit with their proposal a satisfactory certified or cashier's check certified by a responsible bank, cash, or bidder's bond on the City's bond form in favor of the City of Westminster, executed by an admitted surety insurer authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California, subject to approval of the City Attorney, in an amount equal to at least 10% of the amount bid. Document Note: An electronic version may be obtained upon payment, of Twenty-One Dollars and Seventy-Five Cents ($21.75) by emailing Veronica Johnson of Public Works Engineering at Vejohnson@westminster-ca.gov. The work shall be done in accordance with these plans and specifications. INSTALL NEW PLAY EQUIPMENT INSTALL NEW RUBBER PLAY SURFACING (10,304 SF) INSTALL NEW BENCHES (QTY. 4) The work consists of removing and disposing of the existing concrete flatwork, playground equipment, footing, sand, and rubber playground surface; performing site grading; installing new Portland cement concrete sidewalk, curb, playground equipment, rubber playground surface; and all appurtenant work in connection therewith

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.