Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

November 1, 2024

No Information to Display

FM 423 & Nash Dr

Site Work

No Information to Display

$687,753.00

Public - City

img_map_placeholder

FM 423 & Nash Dr, The Colony, TX

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The scope of work consists of the construction of a traffic signal at the intersection of Main St (FM 422) and Nash Drive, and any other work deemed necessary by the City of The Colony. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control, 4 drill shaft foundations (24", 30", 36", and 48"), 4 mast arm traffic signal poles assemblies (24', 44', 55', and 60'), 5 ped pole assemblies, open cut approximately 380 LF of conduit (2", 3", and 4"), bore approximately 581 LF of conduit (3" and 4"), and any other work deemed necessary by the City. Question Deadline 09/25/2024 at 5:00 PM CT Online Portal The opinion of probable construction cost for the overall project is $687,753.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.