Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2024

December 3, 2024

April 2, 2025

112 Spragins St NW

New Construction, Site Work

No Information to Display

$3,555,000.00

Public - City

img_map_placeholder

112 Spragins St NW, Huntsville, AL

51

13

2

Subscribe to View Full Documents

Question Deadline 09/27/2024 at 5:00 PM CT Contract Administrator: John Lones Purchasing Department 256-535-1396 John.Lones@Hsvutil.org Huntsville Utilities in Huntsville, Alabama is seeking bids for the below-mentioned project located in Huntsville, Alabama. Sealed bids will be received by the City of Huntsville, a municipal corporation within the State of Alabama, d/b/a/ Huntsville Utilities, by mail, at P.O. Box 2048, Huntsville, AL, 35804, or personal delivery, at the bid opening location listed below. IFB Number, Project Name, Contractor's name, and Alabama Contractor's License number must be printed on the outside of each sealed bid. Bidder instructions, including pre-bid meeting and contractor questionnaire details, are provided in the bid documents. As part of the bidding process, attendance at the Prebid meeting is considered mandatory. The contractor shall furnish all supervision, labor, materials, supplies, tools, equipment, and transportation necessary to perform the construction called for under this contract in a timely, safe, and professional manner. Bids will be accepted only from qualified General Contractors licensed prior to the bid opening by the State of Alabama. A cashier's check or a bid bond payable to the City of Huntsville, Alabama, d/b/a/ Huntsville Utilities for an amount not less than 5% of the contractor's bid, but in no event more than $10,000.00, will be required to accompany each bid. A performance bond, a payment bond, a maintenance bond, and insurance will be required prior to execution of the contract. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of ninety (90) days. Scope of Work: This is for complete construction of a 161-12 kV substation with secondary oil containment pit. The construction includes foundations, steel erection, equipment placement and wiring.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects