Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

October 9, 2024

November 29, 2024

To Be Determined

Demolition, Site Work

No Information to Display

$1,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Vermilion Crossing, BC

Our team is requesting plans for this project.

Subscribe to View Full Documents

Parks Canada Agency (PCA) is seeking a qualified and experienced contractor to complete a design-build construction contract. This contract includes architecture, engineering, and construction services required to complete the demolition, removal and replacement of the Hector Gorge Salt Shed in Kootenay National Park, BC. The project site is located approximately 55kms south of the Trans-Canada Highway/ Castle Junction interchange (GPS: 50 54 41N; 116 02 17 W). To assist with bonding and insurance requirements, this project is estimated at a value between $500,001 > $ 1,000,000, Taxes extra. Question Deadline 09/25/2024 All enquiries of a technical and contractual nature are to be submitted to the Contracting Authority. Enquiries regarding this solicitation must be submitted in writing and should be received no later than five (5) business days prior to the date set for solicitation closing to allow sufficient time to provide a response. Contractor must perform and complete the Work no later than November 29, 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated contract period will be 1 month(s), with a proposed start date of 2024/10/09. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.