Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

December 31, 2024

June 29, 2025

830 Winnetka Ave N

Renovation

No Information to Display

$1,537,838.00

Public - County

img_map_placeholder

830 Winnetka Ave N, Minneapolis, MN

21

10

Subscribe to View Full Documents

PROJECT DESCRIPTION / OWNER INTENT The intent of this project is to replace the existing, indoor air handling unit, roof mounted condensing unit, and associated electric duct heaters with an air-cooled, low ambient variable refrigerant flow system (VRF) for both heating and cooling. The existing air handling unit and condensing unit will be demolished. All the electric duct heaters will be demolished or disconnected and abandoned in place. The low ambient (-18F) VRF system will be capable of simultaneously heating or cooling. The outdoor units will be located on ground level on the plan west side of the building. The associated refrigerant pipe will be routing into the building then split to the appropriate branch controllers located in the building. Special attention should be paid to the refrigerant routing, as some piping is required to ran across the roof to prevent disturbing the interior facade. Ducted and ductless fan coils will be installed to provided heating and cooling to the spaces. The condensate from these units will be pumped to the nearest acceptable termination point (roof, floor drain, or tail piece). For ventilation, a roof- mounted dedicated outdoors air system (DOAS) with heat wheel energy recovery and back-up electric heat will be installed. The unit return shall be ducted to the building return air plenum. The supply air with be connected to the existing supply air system and connect to each new VRV fan coil. Existing ductwork shall only be modified in areas where lay-in ceiling exists. All hard-lid ceiling is to remain. The new HVAC equipment shall be integrated into the JCI building controls system. The individual units shall be controlled by the manufacturer's control system and each unit will be monitored by the JCI system. The existing electrical service panels will be removed and replaced. All other electrical work is concurrent with the mechanical scope to provide power to the afore mentioned equipment and systems. Clarification Deadline 10/10/2024 4:00 PM Contact Information Questions related to ProcureWare should be addressed to: Michael Rosenfeld (Hennepin County) E-mail: michael.Rosenfeld@hennepin.us Mary Knickerbocker (Hennepin County), E-mail: mary.knickerbocker@hennepin.us All other questions concerning the bid must be submitted through the clarifications tab in ProcureWare.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects