Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 7, 2024

November 6, 2024

No Information to Display

201 W Montgomery St

Renovation

No Information to Display

$100,000.00

Public - County

img_map_placeholder

201 W Montgomery St, Gaffney, SC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Cherokee County is receiving proposals for Windows and Exterior Doors at Cherokee County Commission on Alcohol and Drug Abuse. For any questions about the scope of work or to view the site, please contact James Pruitt at 864- 902-2277 or 864-619-9056. No pro-bid meeting but call James Pruitt for any questions regarding scope of work. The Contractor is to furnish all labor, materials, equipment, and permits (if any are required) to complete the below referenced project based on the following scope of work: 1. Demo and dispose of 13 wood windows and jambs 2. Install 13 new 3/0 x 5/2 white PVC lite windows with GBG insulated glass, argon, synthetic sill and PVC brick mold. 3. Demo one front entry door unit 4. Install one new 1/0 x 3/0 x 1/0 door unit with 6 panel fiberglass door and sidelites on each side of the door. Unit to have PVC brick mold 5. Demo one back exterior door unit 6. Install one new 6 panel 3/0 x 6/8 x fiberglass door unit 7. Install new stain grade trim on all windows and doors, stain and apply two coats of polyurethane finish 8. Paint doors and sidelites 9. Clean up all construction debris 10. Work to be completed during normal working hours and will need to be scheduled with the Director of Cherokee County Alcohol and Drug Abuse in advance *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.