Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

November 11, 2024

February 9, 2025

660 Cliff Dr

Site Work

No Information to Display

$121,000.00

Public - County

img_map_placeholder

660 Cliff Dr, Santa Cruz, CA

26

5

2

Subscribe to View Full Documents

Preparing the site for prefab restroom installation: Site clearing, demolition and excavation; provide all utilities located 6' outside the building perimeter; contractor to coordinate utility connection with PG&E installation of a finished slab with elevation for the prefabricated building; provide survey for building pad and prefabricated building slab elevation and front corners, provide building front corner stakes with a 10' offset; provide any trench plates necessary for the crane and truck placement within a 35' radius from building; coordinate sewer invert elevation with the Public Restroom Company (PRC) prior to building and sewer installation; verify and coordinate location of existing utilities including water meter size, type and location of existing utilities coming into the building supplied by PRC; prepare site for minimum allowable soil bearing pressure of 1,500 PSF, with subgrade compacted to 90% Maximum Dry Density (MDD); furnish coarse stockpile of sand adjacent to foundation for future use by PRC for utility trench backfill; provide sleeves in footings according to utility location plan foundation plan and locations for utility point of connections in accordance with the plans and specs prepared by Bowman & Williams. The Santa Cruz County Parks Department invites you to review and bid on its Hidden Beach County Park Restroom - Site Work project. Details can be found in the attached documents (Volume I: General Specifications, Volume II: Plans & Specifications, and Volume III: Bid Proposal) Any questions regarding the project should be submitted by 5:00p.m. on Tuesday, October 1st, 2024 and directed to the Project Manager, Mariana Colibri-Urgo (mariana.colibri-urgo@santacruzcountyca.gov). Any questions regarding the bidding process may be sent to Juan Perez Alvarez.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.