Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 22, 2024

November 21, 2024

September 17, 2025

501 Old Quarry Rd

Renovation

No Information to Display

$300,000.00

Public - City

img_map_placeholder

501 Old Quarry Rd, Feura Bush, NY

31

35

2

Subscribe to View Full Documents

Reference Number 0000363247 This project is a Wick's Law project and contains bidding opportunities for General, Electrical, Mechanical, and Plumbing Contractors. SUMMARY OF WORK: The General (G) Contract includes providing all labor, materials, machinery, tools, equipment, and other means of construction for an approximately 3,600 square foot new pre-engineered metal building (PEMB) including site work, foundations, and interior finishes. (PEMB scope is not in this contract). The Mechanical (H) Contract includes providing all labor, materials, machinery,tools, equipment, and other means of construction for building heat and ventilation including unit heaters,fans, and louvers. The Plumbing (P) Contract includes providing all labor, materials, machinery, tools, equipment, and other means of construction for building domestic water and sanitary sewer. The Electrical (E) Contract includes providing all labor, materials, machinery, tools, equipment, and other means of construction for building power, lighting, and controlsincluding a new 400 amp service and generator. All work is to be substantially completed 300 days after contract execution The City of Albany MWBE Subcontractor and Minority/Women Labor Participation Policy also applies to this project. This contract has a MWBE subcontractor participation goal of 15%. Subcontractorsmay be City or State-Certified MWBEs. Note this percentage is not in addition to the NYSEFC participation. This Contract also has a Minority/Women Labor Participation goal of 30% of the total labor force hours. The Mechanical (H) Contract includes providing all labor, materials, machinery, tools, equipment, and other means of construction for building heat and ventilation including unit heaters, fans, and louvers. Question Acceptance Deadline 10/17/2024 12:00 PM EDT Questions are submitted online Yes Participation Requirements - Minority Business Participation - Women-Owned Business Participation General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Employee Background Checks Required - Installation Required - Insurance Required - Material Safety Data Sheets Required - Prevailing Wage Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % -- Each bid must be accompanied by a bid security in the amount of five percent of the base bid in accordance with the Instructions to Bidders. If a bid deposit is not submitted with the bid, the bid may be deemed incomplete and may not be considered. The successful Bidder will be required to furnish construction performance and payment bonds in the full amount of the contract price.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.