Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 7, 2024

November 7, 2024

September 30, 2025

500 Townsite Bay

Renovation

No Information to Display

$1,000,000.00

Public - Federal

img_map_placeholder

500 Townsite Bay, Marius, MB

53

16

5

Subscribe to View Full Documents

Work of the Contract comprises the Project, for the Isaac Beaulieu Memorial School Ventilation System Replacement. Project Work includes provision of all required labour & materials for a fully operational heating, cooling and ventilation system. Work includes but is not limited to the following: .1 Demolition, and removal of existing 4 (four) AHU's, 3 (three) DX condensing units and associated selective ductwork, reheat coils, controls, sheet metal, asbestos material and electrical components as indicated in the tender documents. .2 Provide 4 (four) new AHU's, DX condensing units and piping, VAV/reheat coils, radiant heating panels, sheet metal work, controls and associated architectural, mechanical and electrical systems as shown in the drawings and noted in the specifications. .3 Alternate price to provide 3 (three) reverse flow energy recovery ventilators, ductwork, controls and associated architectural, electrical and structural components. .4 Provide the required bonds and liability insurance to ensure such specified assurances to the Owner. .5 Coordination with equipment supplier(s) to schedule delivery, unloading and safe storage of equipment. .6 Layout of the work for construction of complete system and associated works as noted in drawings and specifications. .7 Protect existing foundations, superstructure, interior finishes, plant and equipment during construction. .8 Clean-up of project and site upon completion. .9 Repair all defects identified during the first year after completion of Work. Bid bond in the amount of not less than ten (10)% of the bid price. Or certified cheque in the amount of not less than 10% of the bid price. Question Acceptance Deadline: 2024/10/01 12:00:00 AM CDT Official bid documents must be obtained from www.merx.com .

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.