Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 15, 2024

November 14, 2024

September 30, 2025

Atlanta Rd

Demolition, New Construction, Paving, Site Work

No Information to Display

$500,000.00

Public - County

img_map_placeholder

Atlanta Rd, Grovespring, MO

24

10

2

Subscribe to View Full Documents

Atlanta Road Bridge. Bids must still be received by the bid date deadline. The DBE (Disadvantaged Business Enterprise) contract goals for the amount of work to be awarded for the Laclede County Atlanta Road Bridge Replacement is 5% of the total project price, and 3% for the Bobcat Road Bridge Replacement. The bidder shall also complete the DBE Identification Submittal forms in accordance with the General Provisions. Missouri Law, 292.675 RSMO, requires any awarded contractor and its subcontractor(s) to provide a ten-hour Occupational Safety and Health Administration (OSHA) Construction Safety Program for their on-site employees. The Owner must award the project to the lowest responsive, responsible bidder for the combination of both above listed bridge projects, however the owner may reject all bids. All bidders are required to use the pre-qualification process outlined by MoDOT. See the Missouri Standard Specifications for Highway Construction, Section 102 for additional information. Each Bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within 60 days after the actual date of the bid opening. Site Address: Laclede County Atlanta Road. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer, Jeremy Manning with Smith & Company, in writing Question Deadline 10/04/2024 Site Directions: From Lebanon, head south on Highway 5 for 10.9 miles before turning right(west) on Atlanta Road. The bridge is 2 miles west of Highway 5. The project shall consist of: Replace an aging and deficient bridge on Atlanta Road with new two-span concrete box beam bridge. Replace an aging and deficient bridge on Bobcat Road with a new single span concrete box beam bridge. Description: The project shall consist of: Atlanta Road Bridge-Replace an aging deficient bridge on Atlanta Road with new two-span concrete box beam bridge. Bobcat Road Bridge-Replace an aging and deficient bridge on Bobcat Road with a new single span concrete box beam bridge. No Pre-Bid Conference will be held for this project The Information for Bidders, Bid Form, Bid Bond Form, Agreement (Construction Contract) Form, Performance Bond Form, Payment Bond Form

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects