Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 22, 2024

November 1, 2024

August 28, 2025

Multiple Locations

Site Work

No Information to Display

$3,575,000.00

Public - County

img_map_placeholder

Multiple Locations, Lake Elsinore, CA

29

22

4

2

Subscribe to View Full Documents

Elsinore Valley Municipal Water District (EVMWD) is a publicly owned water and sewer service agency with approximately 46,000 water service connections and 37,000 sewer service connections, serving a population of approximately 157,000. The project is within EVMWD's boundaries and is located within the County of Riverside. The project will install approximately 5,100 LF of 8-inch DIP water main. The replacement limits shall be from Tomlin 1 Pump Station, in Lancashire Drive, to Tomlin 2 Reservoir/Los Pinos 1 Pump Station. The pipeline will be located within an EVMWD 20-foot-wide easement. In addition to the pipeline work, this project will install fiber optic conduits and construct access road improvements. Liquidated Damages $3,000.00 per calendar day Estimated Bid Value $3,575,000.00 Start/Delivery Date November 2024 Project Duration 300 calendar days Question Deadline 10/15/2024 at 2:00 PM PT Online Q&A Yes Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the Board of Directors of the District, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to Elsinore Valley Municipal Water District as bid security. The bid security shall be provided as a guarantee that within ten(10) working days after the District provides the successful bidder the Notice of Award, the successful Bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful Bidder fails to comply within said time. No interest will be paid on funds deposited with District. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects