Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

December 16, 2024

December 16, 2025

Building 850

Remodeling, Renovation

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

Building 850, Bremerton, WA

7

15

Subscribe to View Full Documents

The contractor shall modernize two passenger elevators, designated 850-1 and 850-2, in building 850 at Puget Sound Naval Shipyard (PSNS), Bremerton WA. The modernization shall result in a system in complete compliance with ASME A17.1-2022, Safety Code for Elevators and Escalators. Question Deadline 10/02/2024 Baseline NAS Submit the Baseline NAS at the Post-Award Kickoff (PAK) Meeting or within 30 calendar days after contract award whichever occurs first. The Baseline schedule must include detailed design activities and a general approach to construction, including summary activities for required phasing and definable areas. Summary Construction activities must not exceed duration of 60 calendar days, unless approved otherwise by Contracting Officer. Data date must be set to contract award date and no progress recorded for any activity. Only bonds and the required Preliminary Scheduling Meeting may be recorded as complete prior to acceptance of the Baseline NAS. The acceptance of a Baseline NAS is a condition precedent to: a. The Contractor submitting the first design submittal. b. Processing Contractor's invoices(s)other than that for the bonds.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.