Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

December 9, 2024

November 20, 2025

47 Bloomingdale Ave

Demolition, Remodeling, Renovation, Site Work

No Information to Display

$5,000,000.00

Public - City

img_map_placeholder

47 Bloomingdale Ave, Akron, NY

214

28

Subscribe to View Full Documents

SCOPE INCLUDES: site work; asphalt paving; concrete paving; demo; asbestos remediation; cast in place concrete; cast underlayment; unit masonry; cast stone masonry; structural steel framing; steel joist framing; steel decking; cold formed metal framing; metal fabrications; metal stairs; metal ladders; pipe & tube railings; misc. rough carpentry; FRP; thermal insulation; weather barriers; composite wall panels; EPDM membrane roofing; sheet metal flashing & trim; manufactured gutters & downspouts; roof accessories; penetration firestopping; joint sealants; hollow metal doors & frames; flush wood doors; fiberglass doors; sectional doors; aluminum framed storefronts; aluminum windows; door hardware; glazing; maintenance of wood athletic flooring; gypsum board assemblies; tiling; acoustical ceilings; resilient flooring; fluid applied flooring; tile carpeting; painting; visual display unit; phenolic toilet compartments; toilet bath & laundry accessories; fire protection specialties; phenolic lockers; wall mounted standards & shelving; vehicle washing equipment; gymnasium equipment; window shades; manufactured wood casework; countertops; entrance floor mats & frames; swimming pools; electric traction elevator WAGE = prevailing wage TAX = exempt SCHEDULE = Educational Building by 8/29/25 & Transportation Building by 11/20/25 RFI CUT-OFF DATE = 9/27/24 @ 12:00pm main BUILDING SED NO. 14-21-01-04-0-001-015 BUS GARAGE SED NO. 14-21 -01 -04-5-003-013 MORTON BUILDINGSED NO. 14-21-01-04-2-010 Definition of Extent of Prime Contract Work: The Contract Documents indicate the extent of each prime contract. Except where the Contract Drawings contain a more specific description, the drawings and specifications are complimentary of each other, general names and terminology on the Drawings and in the Specification Sections determine which prime contract includes a specific element of the Project. Prime contractors must review each and every drawing to assure their contract work is all captured. All project related questions shall be directed to Marc Graff; Phone: 716-225-2887, Email: mgraff@campuscmg.com. RFI's, prior to bidding, will be accepted until 12:00 PM on September 27, 2024

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.