Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 9, 2024

November 8, 2024

September 4, 2025

State Hwy 20

Paving, Site Work

No Information to Display

$800,000.00

Public - City

img_map_placeholder

State Hwy 20, Jacksonburg, WV

67

23

3

Subscribe to View Full Documents

Sanitary sewer extension in the Chub Run area to approximately 88 customers including approximately 19,400' of gravity sewer line varying in diameter from 6" through 12", 105 manholes, one lift station, approximately 1,600' 4" C900 DR-18 forcemain pipe and associated restoration including HMA overlay, crusher run overlay and other restoration activities. The Work will be substantially completed within 270 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 300 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000 per day. Bids shall be accompanied by a certified check or bid bond payable to Town of Nutter Fort in an amount equal to five percent (5%) of the base bid. The bidder agrees that he/she shall make "positive efforts" to subcontract at least 7% (2% MBE/5% WBE) of the total value of the contract. The fair share objective shall be obtained in conformance with the six (6) affirmative steps as outlined. Question Deadline 10/02/2024 Bidders hall submit all questions about the meaning or intent of the Bidding Documentsto Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. As indicated at Pre Bid Conference. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details