Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

January 2, 2025

April 30, 2025

To Be Determined

Site Work

No Information to Display

$480,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Bonners Ferry, ID

6

12

5

2

Subscribe to View Full Documents

The project is located at the Boundary-Smith Creek WMA, approximately 28 miles northwest of Bonners Ferry, Boundary County, Idaho. It consists of removing and disposing of three (3) round, corrugated-metal water control structures and replacing them with rectangular, precast concrete structures. Deep excavations and shoring are anticipated, and ground water is likely to be encountered. Proposals must be accompanied by cash (no personal or business checks), a certified check, or cashiers check drawn on a bank in good standing A bid bond in the amount of 5% of the bid is required The successful Bidder shall file with the Owner a Performance Bond and a Labor and Materials Payment Bond on the forms bound herewith, or suitable substitutes, each in the full amount of the Contract price, The Bidder further agrees to begin work within 10 calendar days after the date shown on the Notice to Proceed and to complete the construction, in all respects, for which his Proposal is accepted within the number of calendar days after the date of execution of the Contract by the Owner as set forth below: 90 Calendar Days

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.