Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 7, 2024

June 17, 2025

August 29, 2025

311 W Peltason Dr

Renovation, Site Work

No Information to Display

$1,590,000.00

Public - State/Provincial

img_map_placeholder

311 W Peltason Dr, Irvine, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Student Center Plaza Seismic Joint Repair: The project consists of the repair of concealed waterproofing defects at the seismic expansion joint system integral to the elevated podium deck in an occupied building. The work will include, but is not limited, to selective demolition of existing seismic expansion joints and concrete topping slab. New work will require the sequencing and integration of new 1-hr and 2-hr seismic joints, horizontal waterproofing assembly, and concrete repairs. Other trades included, but are not necessarily limited to, storefront/glazing, plumbing, sheet metal, and masonry. Plumbing work includes installing five new bi-level area deck drains and tying into existing storm drain system. All work will be performed in an occupied building that service students, staff, and the public at large. Estimated Construction Cost: $1,590,000. Mobilization and construction shall start June 17, 2025. Project shall be substantially completed by August 29, 2025. Construction Duration: 73 Calendar Days UCI reserves the right to reject any or all responses to this notice, to waive non-material irregularities, and to deem Contractors prequalified for the project. To prequalify, Contractors must agree to comply with all conditions including state prevailing wages, 10% bid bond, 100% payment and performance bonds, and insurance requirements. General "B" California Contractors Licenses are required. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the bid documents and to pay prevailing wage rates at the location of the work. No contractor or subcontractor may be listed on a Bid for this project unless registered with the Department of Industrial Relations pursuant to California Labor Code Sections 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded any portion of this project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour as of 10/1/17) and shall comply with all applicable federal, state and local working condition requirements. Contact Ladita McBride, Senior Contracts Analyst at (949) 824-1190 or laditam@uci.edu for the questionnaire. At Least One (1) Project That Included the Sequencing and Integrating of the Work for Multiple Subcontractors and Vendors to Remediate Split Slab (Elevated Podium Deck) Waterproofing Repairs at an Occupied Building for Which the Construction Cost Exceeded $1,500,000. at Least One (1) Project That Included the Installation of Seismic Expansion Joint System Integral to Split Slab (Elevated Podium Deck) in an Occupied Building. at Least One (1) Project That Included Installation of Bi-level Deck Drains in a Split Slab (Elevated Podium Deck). at Least One (1) Project That Included Demand Control Ventilation and Integration of Controls With Existing Legacy Automation Systems. at Least Two (2) Projects for Which Your Firm Self-performed at Least 10% of the Construction(Certified Waterproofing, Concrete, Selective Demolition).

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.