Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

November 11, 2024

August 31, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$400,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Ray, ND

93

3

3

Subscribe to View Full Documents

Type - Sidewalk, ADA Ramps, Headwall, Grading, Erosion Control, Handrail, & Incidentals Length - 0.3610 Location - Williams Co; Main St, 3rd Ave W to 4th Ave W; Comford St, 3rd Ave E to 4th Ave E; East St, 4th Ave E to Near 7th Ave E (Ray) Bid Range - $200,001 to $400,000 Prequalification is required for all bidders submitting a bidding proposal form. Prequalification is required annually. Prequalified contractors who wish to renew their prequalification must submit a complete "Contractor's Prequalification Statement" by July 1 of each calendar year. Bidders who are not currently prequalified must submit a complete "Contractor's Prequalification Statement" at least 10 business days prior to the date of the bid opening. Information is available from the Construction Services Division of the North Dakota Department of Transportation. A bid guarantee is required by Section 24-02-20, NDCC. The bid guarantee may be a bid bond equal to 10 percent of the full amount of the bid or a cashier's check of the bidder on a solvent bank equal to 5 percent of the bid. Bid bond shall be on the department form SFN 14196. Prior arrangements may be made with the department to file bid guarantees in advance. Proposed Work Consists Of 0.3610 Miles Of Sidewalk, Ada Ramps, Headwall, Grading, Erosion Control, Handrail, & Incidentals And Involves Approximately: 1 L Sum Contract Bond; 1 L Sum Clearing & Grubbing; 4 Ea Removal Of Trees 18in; 1 Ea Removal Of Trees 30in; 10 Ton Remove Aggregate Base & Surfacing; 122 Sy Removal Of Concrete Pavement; 129 Lf Removal Of Curb & Gutter; 56 Sy Removal Of Bituminous Surfacing; 2 Ea Removal Of End Section-all Types & Sizes; 243 Cy Common Excavation-type C; 1645 Sy Remove & Salvage Topsoil; 76 Cy Borrow-excavation; 15.5 Sta Subgrade Preparation-type A; .3 Acre Seeding Class Iii; .3 Acre Straw Mulch; .3 Acre Hydraulic Mulch; 9 Cy Riprap Grade Ii; 100 Lf Silt Fence Supported; 100 Lf Remove Silt Fence Supported; 400 Lf Fiber Rolls 12in; 400 Lf Remove Fiber Rolls 12in; 6 Lf Weighted Fiber Rolls; 6 Lf Remove Weighted Fiber Rolls; 394 Cy Aggregate Base Course Cl 5; 6 Cy Aggregate Surface Course Cl 13; 20 Ton Commercial Grade Hot Mix Asphalt; 30 Lf Pedestrian Railing; 1 L Sum Mobilization; 40 Mhr Flagging; 920 Unit Traffic Control Signs; 2 Ea Type Iii Barricade; 4 Ea Sidewalk Barricade; 8 Ea Delineator Drums; 75 Ea Tubular Markers; 3 Ea Inlet Protection-special; 3 Ea Remove Inlet Protection-special; 6 Lf Pipe Conc Reinf 24in Cl Iii; 5 Ea Adjust Gate Valve Box; 1 Ea Adjust Utility Appurtenance; 129 Lf Curb & Gutter-type I; 14 Lf Curb-type I; 942 Sy Sidewalk Concrete 4in; 115 Sy Driveway Concrete 6in Reinforced; 64 Sf Detectable Warning Panels; 51 Sf Flat Sheet For Signs-type Xi Refl Sheeting; 88 Lf Steel Galv Posts-telescoping Perforated Tube; 130 Lf Epoxy Pvmt Mk 24in Line-grooved; 50 Lf Pvmt Mk Painted Curb Top & Face; 1 L Sum Headwall. The right is reserved to reject any and all proposals, to waive technicalities, or to accept such as may be determined to be for the best interests of the state. ND DOT - Job No - 23941 - Sidewalk, ADA Ramps, Headwall, Grading, Erosion Control, Handrail, & Incidentals *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects