Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2024

December 17, 2024

June 17, 2027

Multiple Locations

Site Work

No Information to Display

$25,619,800.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Boston, MA

119

20

4

Subscribe to View Full Documents

The Massachusetts Water Resources Authority will receive for Intermediate High Pipeline Improvements CPI Sections 75A and 47, The work includes: all labor, materials and equipment necessary for the installation of pipelines, valves, and appurtenances and rehabilitation of existing water pipelines and water meters in the Town of Belmont, City of Boston, City of Newton, and City of Watertown. The estimated timeframe for project completion is 912 days. The work is being bid pursuantto M.G.L. c. 30, sec. 39M. The estimated project cost is: $25,619,800.00. This contract is subject to a 7.24% MBE and a 3.6% WBE participation requirement. The Work includes all labor, materials, and equipment necessary for the installation of pipelines, valves and appurtenances, and rehabilitation of existing water pipelines and water meters in the Town of Belmont, City of Boston, City of Newton, and City of Watertown as specified and as indicated. The Work includes the Section 75A water main extension in Newton, the replacement of Newton's local water on Ward Street, the Meter 111 replacement in Belmont, and the rehabilitation of Section 47 in Boston and Watertown.

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.