Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2024

July 1, 2025

August 31, 2025

123 Ridge St

Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

123 Ridge St, Georgetown, SC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

Headworks Bar Screen Replacement Bids from qualified and licensed general contractors to replace the screen bar system at the City's Wastewater Treatment Plant (WWTP) located at 123 Ridge Street, Georgetown, SC. Question Deadline 10/04/2024 at 2:00 PM ET emailed to: purchasing@georgetownsc.gov The Contractor shall be responsible for the removal of existing bar screen system and the installation of two (2) new perforated filter screen system assembly fully operational. Work items include: 1. Attend pre-construction meeting with City staff. 2. Field verify existing dimensions and elevations. 3. Engineering submittals. 4. File for City electrical permits and schedule electrical inspections. 5. Remove two (2) existing bar screens including all accessories. 6. Save bar screens for Owner's use. 7. Furnish and install two (2) stainless steel perforated filter screens. 8. Furnish and install two (2) flow switches. 9. Furnish and install all required electrical control panels, electrical operators, indicators, relays, timers, NEMA local control stations, junction boxes, transformer, and switches 10. Furnish and install all necessary electrical wiring and conduits. 11. Shipping, off-loading, installation, and testing of new equipment. 12. Testing and start up to be performed by a qualified technical to the full satisfaction of the owner. 13. Provide testing and startup reports. 14. Provide two-year warranty effective from the startup date.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.