Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

November 4, 2024

November 15, 2024

College Ave

Outdoor Lighting, Site Work

No Information to Display

$50,000.00

Public - City

img_map_placeholder

College Ave, Gunnison, CO

27

8

4

Subscribe to View Full Documents

Reference Number 0000363182 Job Location: Gunnison, CO The Work is located within the City of Gunnison, starting on N. Adams Street and the east end of College Avenue. Work to be performed under this Contract includes but is not limited to furnishing primary and secondary electrical cable and components, furnishing streetlights, installation of materials and components, and all other Work required in accordance with the Contract Documents. Question Deadline 09/26/2024 at 5:00 PM MT Bidder shall submit all questions about the meaning or intent of the Bidding Documents in writing via email. Contact information and submittal procedures for such questions are as follows: A. Email all questions to the City Clerk at cityclerk@gunnisonco.gov. Questions must be submitted The Project has a required Substantial Completion date of October 31, 2024, with an expected Notice of Intent to Award on October 4, 2024, pending City Council approval on October 8, 2024. A pre-bid conference will not be conducted for this Project. Milestone 2 Completion and Final Payment, November 15, 2024. The work of this project consists of the complete installation of primary and secondary electrical for street lighting for the College Avenue Street project. The work of this project shall include the complete electrical installation, testing, inspection and operation of street lighting as shown or specified. B. The City of Gunnison has provided a materials list of required material and products. This list may be incomplete, and the contractor shall procure materials and electrical components as required for a complete project. C. Included is the installation of electrical cable and conductors in conduit already in place. The work will start from the west side of Adams Street and end at the east end of College Avenue. Final primary electrical termination will be at a power pole located on Loveland Street. This project includes but is not limited to the following: 1. Placement of switch gear, lighting transformer with junction box, electrical splitter boxes, pull boxes and 30' light posts and appurtenances where shown. 2. Install and terminate 500 MCM AL Okonite primary electric cabling (see materials list). 3. Install and terminate secondary conductors, pull boxes, switch gear and install City provided transformer. 3. All traffic control, miscellaneous wiring and installation of electrical components as identified within the materials list. 4. Contractor shall provide product submittals for approval prior to ordering materials.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.