Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

November 15, 2024

December 27, 2024

Multiple Locations

Site Work

No Information to Display

$700,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Omaha, NE

9

9

2

Subscribe to View Full Documents

Power Conduit Systems. Description: The work consists essentially of the following estimated quantities: 1 Mobilization 1 LS 2 Construct 4" x 54" Trench Excavation & Backfill 13,900 LF 3 Furnish and Install 4" ID Sch 40 PVC for Primary Cable 13,900 LF 4 Furnish and Install 4" ID Sch 40 PVC for Secondary Cable 9,495 LF 5 Furnish and Install 10" x 3" ID Sch 40 PVC Stub 210 EACH 6 Furnish and Install 4" ID Sch 40 PVC Vertical Riser 315 EACH 7 Furnish and Install 3" ID Sch 40 PVC Vertical Riser 210 EACH 8 Install 2" ID PVC Duct for Communication Line 27,800 LF 9 Install 2" ID PVC Vertical Riser for Communication Line 420 EACH 10 Directional Bore 4" ID Sch. 40 PVC 810 LF 11 Directional Bore 2" ID PVC Duct for Communications Line 1,610 LF 12 Furnish and Install Transformer Box Pad 40 EACH 13 Furnish and Install Service Pedestal 152 EACH 14 Furnish and Install Cable Pull Box 12 EACH 15 Pull Rope in 4" Duct 24,000 LF 16 Install Tracer Wire 24,000 LF The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, easement acquisition, and miscellaneous costs) is $700,000.00. All proposals must be submitted on bid forms furnished by SEH Engineers, and must be accompanied by a bid bond or a certified check in the amount not less than $35,000.00 made payable to the Treasurer of Sanitary and Improvement District 631 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. The Bid Security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked "BID SECURITY" with the project identified thereon. Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. The work herein provided shall be done under written contract with the responsible bidder submitting the lowest acceptable bid in accordance with the requirements of the plans and specifications and as provided by law. Sanitary and Improvement District 631 of Douglas County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities. Question Deadline Sep 23, 2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.