Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2024

November 18, 2024

November 18, 2025

Multiple Locations

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Tulsa, OK

45

5

3

Subscribe to View Full Documents

f or furnishing all tools, materials and labor and performing the work necessary to be done in the construction of the following: Project - Coal Creek and East Bank Areawide Sewer Rehabilitation The entire cost of the improvement shall be paid from Account No. 2431S00013.SewerLInes.Sewer.7500N.75003308.541101 2431X00013.SewerLines.Sewer.7521N.75213300.541101 2431X00021.SewerLines.Sewer.7500N.75003305.541101 Bids will be accepted by the City Clerk from the holder of valid pre-qualification certificates from the City of Tulsa in one or more of the following classifications: A or D Contract requirements shall include compliance as required by law pertaining to the practice of non-discrimination in employment. A Certified or Cashier's Check or Bidder's Surety Bond, in the sum of 5% of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects or refuses to enter into said contract for the construction of said public improvements for said project and furnish the necessary bonds within thirty days from and after the date the award is made. The bidder to whom a contract is awarded will be required to furnish public liability and workmen's compensation insurance; Performance, Statutory, and Maintenance bonds acceptable to the Authority, in conformity with the requirements of the proposed contract documents. The Performance, Statutory, and Maintenance bonds shall be for one hundred percent (100%) of the contract price.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.