Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

December 10, 2024

February 14, 2025

Multiple Locations

Environmental Remediation, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Fort Smith, AR

75

8

2

4

Subscribe to View Full Documents

2016 SSA Remedial Measures, Sub-Basin S007. Description: This project includes approximately 3,794 linear feet of 8-inch and 200 linear feet of 12-inch diameter sanitary sewer line replacement by open cut methods; 5,548 linear feet of 8-inch sanitary sewer line replacement by pipe burst methods, 2,331 linear feet of 8-inch and 603 linear feet of 12-inch remediation by CIPP; the installation of 73 clean outs; the replacement of 27 48-inch diameter manholes; the lining of 38 manholes; and the replacement of 17 manhole frame and covers.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects