Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

November 4, 2024

Haines Rd

Site Work

No Information to Display

$52,920.00

Public - State/Provincial

img_map_placeholder

Haines Rd, Haines, AK

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe to View Full Documents

Contract #: SDRER00639 Federal Project #:N/A IRIS Program #:SDRER00639 Engineer's Estimate Range: Between $200,000 and $500,000 Emergency response to construct revetments to protect the roadway from riverbank erosion on the Chilkat River near mile post 10 of Haines Highway. The Work Includes Construction of Rock Fill to Mitigate Riverbank Erosion at 10-mile Haines Highway. Construct a Rock Fill in the Chilkat River Along Approximately 215 Feet of Embankment at the Location Directed by the Engineer. Contractor Shall Conform to Fish Habitat Permit Fh24-i-0113 Prohibition Against Unloading Haul Units Directly Into the Chilkat River. Other Work Referenced in the Permit Including the Plans for the Enhanced Rootwad Embankment is Not Included in This Letting All Work Under the Contract Shall Be Completed Within 14 Days of Ntp. Work Shall Be Performed in Conformance With the Alaska DOT&PF Standard Specifications for Highway Construction 2020 edition and as detailed in the Scope of Work. Location of Project: Haines Contracting Officer: Christopher Goins, C.M., P.E. Director, Southcoast Region Issuing Office: Southcoast Region To be responsive, a bid must include a bid guaranty equal to 5% of the amount bid, The apparent successful bidder must furnish a payment bond in the amount of 100% of the contract and a performance bond in the amount of 100% of the contract as security conditioned for the full, complete and faithful performance of the contract All work shall be completed in 14 Calendar Days from Notice To Proceed, or by The Department will identify interim completion dates, if any, in the Special Provisions. A bidder requesting assistance in viewing the project site must make arrangements at least 48 hours in advance. The point of contract for inquiries for this project is John S. Kajdan, P.E.. Email: john.kajdan@alaska.gov Phone: (907) 465-1799 A bidder may direct questions concerning bidding procedures and requirements to: Email: srdotpfcontracts@alaska.gov Phone: (907) 465-4493 AKDOT - HNS Hwy MP 10 Erosion ER 9/2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects