Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2024

December 3, 2024

November 17, 2026

To Be Determined

Renovation

No Information to Display

$12,121,765.00

Public - Federal

img_map_placeholder

To Be Determined, International Falls, MN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

Replace Power Distribution Line This project will replace the main underwater high voltage cable and multiple transformer boxes that run from the mainland to the Kettle Falls district. Pad-mounted switchgear, sectionalizing enclosures, elbow terminations, as well as individual and other associated components will be replaced as needed. An improved level of emergency backup generation for critical loads at Kettle Falls Area will be installed. Due to the compromised neutral wire, this poses a serious safety risk to visitors as well as employees. The neutral serves as a ground for the cable, and as more lightning strikes occur the chances of someone being struck increase. Secondly when power goes out facilities are forced to be closed such as restrooms, showers, and the restaurant. There is also a food safety factor at the restaurant due to the freezers and coolers loss of power. This has potential for food to develop bacteria that could lead to sickness of visitors. The Fire suppression system pumps are run by electricity; therefore, if there is no power then there is no fire protection for the Historic hotel. This jeopardizes the visitor's safety as well as the historic building. The new backup generator would allow the concession to continue to stay operational in the event of a power outage Estimated Magnitude of Construction: Greater than $10M The Contractor shall begin performance within 10 calendar days and complete it within 714 calendar days

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects