Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

September 30, 2024

December 1, 2024

To Be Determined

Renovation

No Information to Display

$150,000.00

Public - Federal

img_map_placeholder

To Be Determined, Chey Mtn AFB, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

DESCRIPTION OF SERVICES: 1.1. OVERVIEW OF SERVICES REQUIRED: Design, purchase, installation, replacement and testing. Replacing the current GE Diamond to the PL4 AMAG ACS Cutover and AMAG Client Installation for the 561 NOS building 1844 at Peterson Space Force Base (PSFB). 1.2. SPECIFIC REQUIREMENTS: Submit your proposal in accordance with the Statement of Work and Requirements. The proposed equipment and installation locations should align closely with this statement of work. The 561 NOS Project Manager will approve any refinements or changes. All questions regarding the RFQ package must be submitted to the above e-mail addresses by 17 September 2024 at 1000 hours MT. Any questions asked over the telephone will not be answered. Any questions received after this date and time may not be answered. PROJECT LOCATION: Inside the Communication closets room 112, room 122, Building 1844, Peterson SFB, CO. Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.