Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2024

October 28, 2024

June 1, 2025

119 E Olin Ave

Renovation

No Information to Display

$400,000.00

Public - City

img_map_placeholder

119 E Olin Ave, Madison, WI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe to View Full Documents

Asphalt Roof Replacement at Madison Water Utility Olin Building. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. Questions Due Date: Friday, September 20, 2024 Answers Posted Date: Friday, September 23, 2024 SUMMARY OF WORK 53 A. Unless otherwise specified in the drawings, specifications and provisions of the contract, the Contractor shall 54 furnish all materials, tools, equipment, apparatus, transportation, labor and supervision required to remove the 55 existing 17,000 Sqft. (approximate, contractor to verify) shingle roof and install a new roof system and related 56 work at Madison Water Utility, located 119 East Olin Ave, Madison, Wisconsin. 57 B. The contractor shall furnish and install a new asphalt roofing system which generally consists of the following 58 work:Location*1. Remove the existing roofing system consisting of all shingles, related underlayment, and metal flashings 2 from all roof areas. 3 2. Inspect existing sheathing (R-20 Ventilated Nailable Insulation) and at the discretion of the owner, 4 replace any deteriorated areas of sheathing in kind. Pictures are required. 5 3. Coordinate roof work with repointing work or any other process. 6 5. Inspect existing soffits, fascia boards, crown and bed moldings, and rafter tails and repair or replace any 7 deteriorated materials in kind. 8 6. Replace existing metal roof penetration components (ventilation fan covers and vent riser transition 9 sleeve) and provide related flashings. Remove any obsolete or unused roof apparatus. 10 7. Prepare substrate, prime, and paint repaired or replaced wood trim elements in the color to match 11 existing color scheme. Prepare substrate, prime and paint metal penetration components that extend 12 above the roof in dark brown color to match adjacent brown flashing color. 13 9. Install leak barrier and underlayment. 14 10. Install a Class A fire rated asphalt roofing system. 15 11. Install new sheet metal flashing at all roof edges and vertical walls, and stepped flashing and cap at 16 chimneys. 17 C. Perform disposal of demolition debris and construction waste in a manner complying with all applications of 18 federal, state, and local regulations and sections within the Project manual. Refer to Section 01 74 19 19 "Construction Waster Management and Disposal". 20 D. Commencement of work shall constitute acknowledgement that this specification can be satisfactorily executed, 21 under the project conditions and with all necessary prerequisites for warranty acceptance by roofing materials 22 and treatment manufacturer. 23 E. Attendance at Meetings - refer to Section 1.5 MEETINGS. 24 F. Provide warranty information - refer to Section 1.7 WARRANTY. 25 G. Provide attic stock - 3 bundles of shingles at each building.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.