Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2024

October 24, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Hopedale, NL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe to View Full Documents

Closing Time: 2:00 PM (NT) ** Please note that there is 1 Addendum for this tender** Question Acceptance Deadline 2024/09/24 12:00:00 AM NDT General 1 Provide all labour, materials, equipment, superintendence, temporary facilities and administration necessary to perform the Work outlined below and described in greater detail in this specification. 2 All work in this project is to be completed in accordance with all related NL Housing specifications and Occupational Health and Safety requirements. If you require a copy of our specifications please contact the NL Housing representative. 3 The NL Housing representative is to be contacted with any discrepancies prior to proceeding with the Work. 4 All measurements and quantities in scope/drawings are estimated and for bidding purposes only. 5 Contractor to ensure all work is completed in accordance with the current edition of the NL Guidance Document for the Management of Impacted Sites. Contractor must also be a Registered Site Professional within the Province. 1.2 Project Description 1 Work for this project includes but is not limited to the Indoor Air Assessment at 4 units, 10 A, B, C, D Carpenter's Loop, Hopedale and 1 unit 19 Laura's Lane, Makkovik. It also includes the Soil Vapour Assessment for the downgradient private home at the boundary of 19 Laura's Lane, Makkovik. Work for this project is as specified herein and referred to in the specifications. (See attached location plans & photos) 2 The following outline is general and is not to be considered complete in every detail. Contractor responsible for and damages caused outside the scope of work during this work. Before submitting a quote, bidders shall carefully examine the Contract Documents and the site of the proposed work to fully inform themselves of the existing conditions and limitations. 3 Contract price to include all equipment, travel, accommodations, per diems, laboratory sampling and analysis and professional & administration fees to submit findings as outlined above and to provide further recommendations to the owner on the occupancy of all units. All units are currently vacant with the exception of 10C Carpenter's Loop. Contractor is responsible to provide schedule at least 72 hours in advance to conduct site visits and to facilitate the work. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects