Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 9, 2024

December 2, 2024

May 19, 2025

Multiple Locations

Site Work

No Information to Display

$6,253,875.00

Public - City

img_map_placeholder

Multiple Locations, Garden Grove, CA

32

8

3

Subscribe to View Full Documents

The project consists of constructing approximately 10,000 linear feet of new 8-inch PVC pipe to replace undersized 6-inch water mains at Chapman Avenue, Nearing Drive, Augusta Drive, Moen Street, Fortney Drive, Buchanan Drive, Poe's Street, Somers Drive, Fillmore Drive, Arthur Drive, Sandy Drive and Rock view Drive in the unincorporated area of Orange County and City of Stanton. This replacement project will also address fire flow deficiencies. The construction includes the installation of new fire hydrants and water service laterals, fittings and appurtenances. Work also includes trenching, shoring, backfilling, compaction, asphalt repair and replacement, and pipe disinfection and testing. This project will require (but not limited to) protecting existing utilities, coordination with utility owners and customers, traffic control plans, permits and implementation, construction surveying, cutting and capping of existing water mains and service laterals to be abandoned, temporary offsets of the existing water main crossing new water main, vertical off-sets, water shutdown coordination and notification, water system tie-in/connection locations, demolition and disposal of asbestos cement pipe, traffic striping, traffic loop detector replacement, and appurtenant work. The project will be constructed in two phases. Working hours at Nearing Drive and Chapman Avenue may be restricted do to school traffic coordinating with Saint Polycarp School and Church and Bryant Elementary School may be necessary. This project should be complete within one hundred and twenty (120) total working days from the notice to proceed. The first day of construction shall be December 2, 2024. Engineer's estimate on this project is around $6,253,875 dollars. Direct ANY and ALL questions to Ms. Jessica Polidori, Project Manager, (714) 741-5346.

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.