Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 18, 2024
November 18, 2024
July 16, 2025
Thompson Mill Rd
Paving, Site Work
No Information to Display
$3,000,000.00
Public - City
Thompson Mill Rd, Braselton, GA
We’ve obtained documents for this project and are currently processing them.
The Owner of the project is the Town of Braselton. The Engineer for the project is BM&K Construction & Engineering. The approximate extent and character of the Work is generally described as follows: Extension of 10' shared-use path along Thompson Mill Road as noted within this document. Bidders shall inform themselves concerning Georgia Laws and comply with same. All engineering and technical questions should be directed to John D. Jenkins, P.E., at jojenkins@bmandkinc.com. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five percent (5%) of the total amount payable by the terms of the contract or, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. The Successful Bidder will be required to furnish a performance bond for 100% of the contract amount and a payment bond for 100% of the contract amount, with the executed Agreement meeting the requirements of the Contract Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement. Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Requests for payments are due by the Fifth (5 th ) of the month for the payment by the Twentieth (20 th ) of the month less 10% retainage. Retainage will be held until final acceptance of the project by the Town of Braselton. All Bids will remain subject to acceptance for 60 days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise. The time allowed for Substantial Completion is 240 consecutive days from the date specified in the Notice to Proceed. Nonrefundable liquidated damages in the amount of $300 per calendar day will be deducted from monies due the Contractor in the event that a portion of the work remains incomplete beyond the agreed upon contract completion date. The official Notice to Proceed is anticipated to be the given to the chosen contractor in the Fall of 2024. Bid date notes: Each proposal must be submitted in a SEALED ENVELOPE addressed to the OWNER. Each sealed envelope containing a Proposal must be plainly marked on the outside as, "Bid for Town of Braselton 2024 Thompson Mill Road Lifepath Extension", and the envelope should bear on the outside the name and address of the bidder. This section, as supplemented by the Plans, Specifications, and Manual on Uniform Traffic Control Devices (MUTCD) shall be considered the Temporary Traffic Control (TTC) Plan in accordance with Work Zone Safety and Mobility Policy. Activities shall consist of furnishing, installing, maintaining, and removing necessary traffic signs, pedestrian signs, barricades, lights, signals, cones, pavement markings and other traffic control devices and shall include flagging and other means for guidance and protection of vehicular and pedestrian traffic through the Work Zone. This Work shall include both maintaining existing devices and installing additional devices as necessary in construction work zones. The Contractor shall be responsible for the maintenance of traffic signals and Advanced Traffic Management System (ATMs) devices from the time that the system is modified until final acceptance. The maintenance of traffic signals and ATMs devices that are not a part of the Work and that are not in conflict with any portion of the Work shall not be the responsibility of the Contractor. However, the Contractor is still responsible for damages to all devices that they or their subcontractors cause, in accordance with Section 107 and other Specifications. When any provisions of this Specification or the Plans do not meet the minimum requirements of the MUTCD, the MUTCD shall control. The 2023 Edition of the MUTCD including revisions shall be in effect for the duration of the project. All traffic control devices used during the construction of the project shall meet the standards utilized in the MUTCD, and shall comply with the requirements of these Specifications, Georgia Construction Standards and Details, Project Plans, Design Manuals, and Special Provisions. The needs and control of all road users (motorists, bicyclists and pedestrians within the highway right-of-way and easements, including persons with disabilities in accordance with the Americans with Disabilities Act of 1990 (ADA), Title II,) through a Temporary Traffic Control (TTC) zone shall be an essential part of highway construction, utility work, maintenance operations and management of traffic incidents. Utilities included in the Contract are bound by Special Provision 150 and shall follow its requirements. For utilities not included in the Contract but working within the project limits, they shall, at a minimum follow the MUTCD. Moreover, in accordance with Utility Accommodation Policy and Standards Manual dated 2016, the Engineer reserves the right to require additional certified flaggers, signs, warning lights, channelization devices, and other safety devices as may be necessary to properly protect, warn, and safeguard the traveling public. In addition, the Department reserves the right to place time restrictions or moratoriums on all utility work covered under a permit when, in the opinion of the Department, the continuance of the Work would seriously hinder traffic flow, be needlessly disruptive, or would unnecessarily inconvenience the traveling public. In case of emergencies, Utilities shall be provided access in accordance with Utility Accommodation Policy and Standards Manual.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Braselton, GA
Bid Date: Aug 19 2024
Braselton, GA
Bid Date: Oct 03 2024
Braselton, GA
Bid Date: Oct 23 2024
Braselton, GA
Bid Date: Aug 23 2023
Braselton, GA
Bid Date: Aug 24 2023
Braselton, GA
Bid Date: Sep 08 2023
Braselton, GA
Bid Date: Aug 18 2023
Braselton, GA
Bid Date: Aug 03 2023
Savannah, GA
Bid Date: Aug 07 2024
Reidsville, GA
--
Roswell, GA
Bid Date: Oct 10 2024
Macon, GA
Bid Date: Aug 27 2024
Brunswick, GA
Bid Date: Sep 20 2024
Hinesville, GA
Bid Date: Sep 17 2024
Decatur, GA
Bid Date: Sep 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.