Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

November 4, 2024

August 1, 2025

Pierce St

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Pierce St, Red Oak, TX

14

10

3

Subscribe to View Full Documents

The project includes construction of approximately two-thousand three hundered (2,300) linear feet of 10-inch sewer line as detailed in the Construction Plans and Specifications. The sewer line begins approximately at the intersection of Pierce St and Dunn St, continuing west along Pierce St before crossing under N Central Blvd/SH-342 and turning southwest until the intersection of N Central Blvd and Water/Main St. Bidders must submit a Cashier's or Certified Check, issued by a bank satisfactory to the City of Red Oak, or Bid Bond issued by a bonding company satisfactory to the City of Red Oak, payable without recourse to the order of the City of Red Oak in an amount not less than five percent (5%) of the largest possible bid submitted as a guaranty that Bidder will enter into contract and execute Bond and Guaranty in the forms provided within ten (10) days after Notice of Award of Contract to him. Bids without required check or bid bond will not be considered. The successful bidder must furnish Performance Bond, Payment Bond and Maintenance Bond in the amount of one hundred percent (100%) of the total contract price from a Surety Company holding a permit from the State of Texas to act as Surety. Notice of award of contract shall be given by the Owner within sixty (60) calendar days following the opening of bids. The low bidder must qualify within two (2) working days after bid opening, by submitting such additional evidence as may be required by the City. The low bidder must furnish Certificates of Insurance that meets the City requirements as part of bid package. Should the bidder fail to produce evidence satisfactory to the City on any of the foregoing points, he may be disqualified and the work awarded to the next responsible bidder so qualifying. Questions regarding the project may be directed to Jared Binford, Interim Public Works Director at (469) 218-7744. The deadline to ask questions is 9/27/2024 10:00 PM CDT The City of Red Oak reserves the right to reject any or all bids and to waive formalities. In case of ambiguity or lack of clearness in stating prices in the bids, the City of Red Oak reserves the right to consider the most advantageous construction thereof, or to reject the bid. Unreasonable (or "unbalanced") unit prices will authorize the City of Red Oak to reject any bid.

51 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.