Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

November 11, 2024

January 10, 2025

9650 Sheridan Boulevard

Paving, Site Work

No Information to Display

$730,000.00

Public - County

img_map_placeholder

9650 Sheridan Boulevard, Westminster, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Reference Number 0000363052 Job Location: 9650 N. Sheridan Blvd. Hyland Hills Park and Recreation District is seeking bids for bridge skirting and railing repairs on 2 bridges at the Greg Mastrionia Golf Course Lake 8. The Lake 8 Bridge crosses a pond at hole # 8 at the Greg Mastriona Golf Course. Photos of the existing bridge are included. Bidders are requested to examine current conditions, measure for quantities and provide recommendations for repair according to the following descriptions: The existing bridge has wooden skirting below the deck and wooden runners on the railing. The existing posts and rails are metal and appear to be in good condition. The skirting is to be replaced with powder coated or similar pre coated metal panels. The wooden frame behind the panels appears to be in good condition. It should be inspected and repaired as needed. The metal brackets behind the frame appear to be in good condition. should be inspected and repaired as needed. All existing metal frames, brackets, attachments and other metal pieces are to be sanded or sandblasted and recoated. Specs for coating will be provided. The wooden runners on the railing are to be replaced with vertical metal pickets. The gap between pickets is to be 4" or less. A second shorter bridge crosses the Farmers Highline Canal near the pond. It will be repaired in the same manner as the Lake 8 bridge, with the exception of the skirt. This bridge does not currently have a skirt or brackets, but should be added. Railing repairs will be included. Include a description of recommended repairs, how repairs are to be made, quantities of materials and recommended repairs. Provide cut sheets and or spec sheets on materials to be used. Question Deadline 10/04/2024 at 4:00 PM MT Questions are submitted online Yes, Questions will be answered electronically thru Online. Submit questions to sheger@hylandhills.org Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % 100% Performance and Payment Bonds will be required from the awarded bidder for bids over $50,000.00 60 calendar days will be allowed for completion. $500.00 per day liquidated damages will apply for late completion.

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects