Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 9, 2024

October 21, 2024

October 4, 2025

1050 Maryvale Dr

Paving, Renovation, Site Work

No Information to Display

$4,600,000.00

Public - City

img_map_placeholder

1050 Maryvale Dr, Cheektowaga, NY

112

32

2

Subscribe to View Full Documents

Painting, Locker replacement, PA replacement, Toilet Renovation, Flooring, Electrical gear replacement, paving PROJECT 20076.2 All questions, interpretations, clarifications, etc. pertaining to the bid documents must be made in the separate form provided on the next page and submitted at least seven days prior to the bid opening. All questions are to reference a drawing number or specification section with page number. These questions should be emailed to the following (3) people with the email subject 2021 Capital Improvements Project Phase 1: 1. Rob Smithgall at rsmithgall@youngandwright.com 2. Kara Yudikaitis at karay@youngandwright.com Project Location: Maryvale UFSD Main Campus 1050 Maryvale Drive Cheektowaga, NY 14225 If you should have any questions, please contact Young + Wright Architectural at (716) 842-1800. Project Description: Project consists of flooring abatement & replacement, corridor locker replacement, toilet room renovations, corridor painting, mechanical system updates, paving & drainage scope, parking lot reconfiguration, substation replacement, sidewalk replacement, P.A. system replacement, pouring slab in basement. G. This bid is inclusive of Phase 2 & 2b drawings sets at Maryvale 9-10 Building and Middle/Intermediate School. Phase 2 & 2b scopes of work shall take place concurrently per the Project Schedule in Section 01 1100.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects