Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 15, 2024

November 14, 2024

February 22, 2025

To Be Determined

Renovation

No Information to Display

$390,000.00

Public - City

img_map_placeholder

To Be Determined, Long Beach, CA

283

18

2

4

Subscribe to View Full Documents

Buildings D, L, and K Mechanical Equipment Replacement Project This project consists of the installation and commission of two (2) OFCI boilers on the roof of Building D; the installation and commission of two (2) OFCI boilers in the basement of Building L; and the installation and commission of four (4) OFCI AC units on the roof of Building K. Q&A Deadline 10/04/2024 10:00 AM (PDT)

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects