Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

June 2, 2025

September 1, 2025

To Be Determined

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

To Be Determined, Valparaiso, IN

17

7

2

Subscribe to View Full Documents

The project consists of streambank stabilization work within an approximately 1,200 LF section of the Oakwood Branch of Beauty Creek that is severely eroded. Construction will include earthwork and grading, installation of riprap cross vanes, seeding, and miscellaneous soil erosion and sediment control measures. Proposals shall be properly and completely executed on the Bid Form, and must be accompanied by an executed Indiana State Board of Accounts Form 96, confirmation that copies of Addenda were received (if issued), and satisfactory bid security. A certified or cashier s check payable to the Valparaiso City Utilities or a bid bond in an amount equal to five (5) percent of the bid amount must accompany each bid. All checks of unsuccessful bidders shall be returned to them by the City upon selection of successful bidder. The successful Bidder will be required to provide a Performance and Payment Bond each in the amount of one hundred (100) percent of the Contract amount. Any questions are due (3) days before bids are due. There will be no pre-bid meeting for this project. Contractors shall familiarize themselves with the field conditions and locations in preparation for their bids. The Utility Board reserves the right to reject any and all bids or to waive any informalities in the bidding, should the Board deem it to be in the public interest to do so. Question Deadline 10/03/2024 any prospective Bidder is in doubt as to the true meaning of any part of the Project Documents, he may submit a written request for clarification to the Engineer. The individual submitting the request shall be responsible for prompt delivery to the Engineer. To be given consideration, written requests must be received by the Engineer at least three (3) days prior to the date fixed for the opening of Bids.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.