Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

November 7, 2024

September 1, 2026

Gravois Rd

Outdoor Lighting, Paving, Site Work

No Information to Display

$800,000.00

Public - County

img_map_placeholder

Gravois Rd, High Ridge, MO

106

9

4

Subscribe to View Full Documents

The proposed work includes adding a two way left turn lane (TWLTL) throughout the project limits for motorists turning into the neighboring subdivisions and school entrances. The new roadway will incorporate adding a 10 shared use base on the East side of the roadway that incorporates a red stamped concrete buffer, along with street scape lighting throughout the project limits. The project includes modular block retaining walls, underground storm sewers, pedestrian fencing, concrete and asphalt paved approaches, crack sealing, concrete base repairs, an Ultra-thin Bonded Wearing Surface, and pavement markings throughout the project limits. The total project limits are 5,040 Feet or 0.95 Miles. The contractor shall have a maximum of One Hundred Forty-Five (145) Working days to complete the project, or a completion date of September 1st, 2026 - whichever shall occur first. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2024 Edition. The contractor questionnaire must be on file 7 days prior to bid opening. A cashiers check or bid bond in the amount of 5% shall be submitted with each proposal. A certificate of insurance shall be submitted with each proposal. The DBE goal for this project is 8 % MODOT - Gravois Rd / Northwest School MBE (14.7%), WBE (6.9%), DBE (8%)

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.