Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

November 4, 2024

April 1, 2025

905 NJ-35

Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

905 NJ-35, Belmar, NJ

7

14

2

Subscribe to View Full Documents

Disclaimer: IN ORDER FOR YOUR BID TO BE CONSIDERED A LEGAL BONAFIDE BIDDER ON THE PROJECT, DOCUMENTS MUST BE PURCHASED FROM REMINGTON, VERNICK ENGINEERS DIRECTLY Piling and Fuel Dock Replacement at Belmar Each bid shall be accompanied by a certified check, cashier's check or bid bond duly executed by the bidder as principal and having as surety thereon a surety company approved by the Borough Of Belmar in an amount not less than ten percent (10%) but in no case in excess of $20,000.00 of the amount bid. The Contract to Be Executed by the Successful Bidder Will Provide That It Shall Not Become Effective Until the Necessary Moneys to Do the Work Have Been Provided by the Borough of Belmar in a Lawful Manner. The Award Shall Further Be Subjected to the Securing of Necessary State, Federal or Local Permits Governing the Work. Bidders Are Required to Comply With the Requirements of N.j.s.a. 10:5-31 Et Seq., N.j.a.c. 17:27 (Affirmative Action), N.j.s.a. 34:11-56.25 Et Seq.(New Jersey Prevailing Wage Act), and Americans With Disabilities Act of 1990 (42 U.s.c. S12101, Et Seq.). The Contractor is Further Notified That He Must Comply With N.j.s.a. 52:25-24.2, and Submit a Disclosure Statement Listing Stockholders With His Bid. The Contractor is Further Notified That He Must Comply With N.j.s.a. 34:11-56.48 Et Seq. Public Works Contractor Registration Act and He and Any Subcontractors Must Be Registered in Accordance With the Act. The Contractor is Also Further Notified That He Must Comply With N.j.s.a. 52:32-44 and Submit Proof of Business Registration and Submit Proof of Business Registration for Any Named Subcontractors in Accordance With the Act. The Borough Of Belmar reserves the right to consider the bids for sixty (60) days after the receipt thereof, and further reserves the right to reject any or all bids, either in whole or in part and also to waive any informality in any and make such awards or take action as may be in the best interest of the Borough Of Belmar. Doc info : Bid Forms, Contracts and Specifications Are Available by Contacting Remington & Vernick Engineers. Contact Shall Be Made by Phone or by Email to Make Bid Purchase Arrangements. At 732-286-9220 or by Submitting Rvebidinterest@rve.com. All comments must be received by noon on September 27, 2024. This meeting is not a prerequisite to bidding but is to aid all contractors to understand the project. Question Deadline 09/23/2024 No interpretations of the meaning of the drawings, specifications or other contract documents will be made to any bidder orally. Every request for such interpretation should be made in writing, addressed to the Engineer, and to be given consideration, must be received at least ten (10) days prior to the final date fixed for receiving bids. Any and all such interpretations and/or supplemental instructions will be in the form of written addenda to the specifications, which if issued, will be issued in accordance with applicable State Laws

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects