Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

October 24, 2024

November 30, 2024

Hemlock Ln & Woodland Heights Rd

Site Work

No Information to Display

$200,000.00

Public - County

img_map_placeholder

Hemlock Ln & Woodland Heights Rd, Arch Cape, OR

3

3

Subscribe to View Full Documents

Clatsop County Public Works intends to contract for 307 lineal feet of drainage installation in the Arch Cape area at the intersection of Woodland Heights Lane & Hemlock Road and within the right-of-way Woodland Heights Lane. Contractor shall furnish all labor, materials and equipment. Contractor must be licensed and bonded. It is recommended the potential contractor visit the site prior to submitting a quote. Selected Contractor will be required to sign a contract with the County and will need to provide proof of insurance with Clatsop County named as the additional insured. All work must be completed prior to November 30, 2024. Project Description: CONTRACTOR SHALL: Comply with the, State and Federal Codes and the requirements of local code officials. Comply with all OSHA safety requirements. Provide all equipment and materials to complete the project. Guarantee all work for (1) year from date of completion. Work to be completed consists of the following: All traffic control and protection and direction of traffic necessary for safety of motorists as required by the Oregon Manual on Uniform Traffic Control Devices. Provide all equipment, material and labor to complete installation of 3 - ODOT Type 3 concrete catch basins to grade as specified in plans and 307 feet of 8" SDR 35 pipe and fittings to restore drainage from the intersection to the ravine to the north. All excavated material becomes the Contractor's property. COUNTY SHALL 1. Place survey marks and offsets for the placement of the three catch basin locations. Work to be Completed Install 3 new ODOT Type 3 concrete catch basins with risers and H-20 rated grates to grade. Risers 1 - 6" 1 - 12" Excavate and install 307 lf of 8" SDR 35 to grade and connect catch basins. Replace all excavated material with 3/4 "- 0 aggregate, mechanically compacted in lifts not to exceed 10" - approx. 85 CY. Place 3 CY of Class 100 Rip Rap below outfall for outfall protection. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.