Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

May 23, 2025

July 15, 2025

Rolfes Rd

Site Work

No Information to Display

$1,100,000.00

Public - City

img_map_placeholder

Rolfes Rd, Marion Township, OH

32

17

4

Subscribe to View Full Documents

Bids will be received on a unit price basis as outlined in the bid documents: The project includes the extension of a 12" waterline to the Marion Local Schools from the existing Village of Chickasaw Water System and other associated work. Bids must be signed and submitted on the separate bidding forms included in the Bidding Documents, sealed in the provided envelope, and shall be accompanied by either a Bid Guaranty Bond in the amount of 100% of the Bid amount or by a certified check, cashier's check, or letter of credit on a solvent bank in the amount of not less than 10% of the amount of the Bid, subject to conditions provided in the Instructions to Bidders. Bid security, furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. The successful Bidder will be required to furnish a satisfactory Performance Bond in the amount of 100% of the Bid. All contractors and sub-contractors involved with the project will, to the extent practicable, use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9 shall be required. Attention of bidders is called to all of the requirements contained in this bid packet, particularly to the Federal Davis-Bacon prevailing wage rates, encouragement of Disadvantaged Business Enterprises (DBE) utilization, various insurance requirements, various equal employment opportunity provisions. The Owner reserves the right to reject each and every bid and to waive informalities, irregularities and errors in the bidding to the extent permitted by law. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than 10 days prior to the date for opening of bids may not be answered.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.