Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

December 2, 2024

No Information to Display

1100 10th St

Addition, Demolition, Paving, Renovation, Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

1100 10th St, Eldora, IA

109

30

6

3

Subscribe to View Full Documents

The South Hardin CSD is planning the construction of a precast gymnasium addition with restrooms at the Eldora New Providence Elementary School. The project will also consist of renovation to the existing ENP Elementary including updates to finishes, installation of fire suppression system and upgrades to the fire alarm. Along with the addition and renovation, the project will include a new parking lot and updates to underground utilities. Project consists of multiple Prime Contractor packages: BID PACKAGE #5 - PRECAST, STEEL SUPPLY & ERECTION BID PACKAGE #6 - GENERAL CONSTRUCTION BID PACKAGE #7 - ROOFING BID PACKAGE #9 - FLOORING BID PACKAGE #10 - LOCKERS BID PACKAGE #21 - FIRE SUPPRESSION BID PACKAGE #22 - PLUMBING & MECHANICAL BID PACKAGE #23 - ELECTRICAL The bids are for multiple Prime Contracts as indicated by DCI Group for the construction of the additions and renovations at Eldora New Providence Elementary School, Eldora, Iowa. Bids shall be on a lump sum basis; segregated sub-bids will not be accepted. For further information, contact: Garrett Arganbright DCI Group, Inc 220 SE 6th Street, Suite 200 garretta@dcigroup-us.com Telephone: 641-757-9791 Work is anticipated to commence upon award of contract, and be completed as shown in the Contract Documents. Bid security in the amount of 10% of the total bid in the form of certified check, credit union share draft, or surety bond written on an original AIA Document A310, Bid Bond is required for this project. The successful bidder will be required to provide surety Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the Contract Sum. The right is reserved to reject any and all bids, or any part thereof, and to waive informalities, and to enter into such contract or contracts as shall be deemed in the best interest of the Owner.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.