Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

December 2, 2024

November 27, 2025

To Be Determined

Site Work

No Information to Display

$1,500,000.00

Public - City

img_map_placeholder

To Be Determined, Huntington, WV

40

25

18

4

Subscribe to View Full Documents

Construction of wastewater lift stations needed to transfer wastewater to Owner's existing wastewater collection system. Work shall include construction of three (3) lift stations, upgrades to one (1) existing lift station, minor installation of gravity sewer mains and forcemains as needed to interconnect with work to be performed by others, furnishing of two (2) portable generators, and all necessary appurtenances. Bids shall be accompanied by a certified check or bid bond payable to the Huntington Sanitary Board in an amount not less than five percent (5%) of the base bid. Contract #1 - Route 10 Sanitary Sewer Extension: Extension ofOwner's wastewater collection system to neighborhoods, homes, and businesses along WV Route 10, Mt. Union Road, Green Valley Road, and environs. Work shall include installation of approximately 19,900 LF of gravity sewer mains, 4,200 LF of forcemains, three (3) grinder pump stations, interconnection with existing systems work to be performed by others, and all necessary appurtenances. Contract #3 - Lift Stations: Construction of wastewater lift stations needed to transfer wastewater to Owner's existing wastewater collection system. Work shall include construction ofthree (3) lift stations, upgrades to one (1) existing lift station, minor installation of gravity sewer mains and forcemains as needed to interconnect with work to be performed by others, furnishing oftwo (2) portable generators, and all necessary appurtenances. The goal ofthe project is to extend sewer service to approximately 300 new customers along WV Route 10 and surrounding neighborhoods, with a particular focus on the Green Valley Heights subdivision, which is currently served by a failing package WWTP. The WVDEP has ordered the HSB to provide residents of this subdivision with sewer service by February 2026. The project is divided into three (3) contracts, but due to funding constraints, only two ofthese contracts are bidding at this time. The Owner reserves the right to reject any and all bids The Work will be substantially completed and ready for final payment after the date when the Contract Times commence to run as listed above. Liquidated damages shall be $2,500.00 per day Question Deadline 09/20/2024 at 4:00 PM ET Questions will only be accepted via email to eschultz athethrasher>>i oup.com

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit