Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

September 30, 2024

March 31, 2025

Multiple Locations

Service, Maintenance and Supply

No Information to Display

$300,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Spruce Grove, AB

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Water Infrastructure & Operations Branch (WIOB) of the Ministry of Agriculture and Irrigation (AGI) requires a general Contractor that can deliver a wide array of specialized maintenance/replacement services, labour, and equipment in a timely manner, to meet some of the operational and maintenance requirements for the culvert infrastructure owned by WIOB. There will be a total of ten (10) culverts, located from SW 25-57-7-5 (culvert #3) to NE 9-59-4-5 (culvert #76), on the Paddle River dyking system that require maintenance and/or replacement services; details pertaining to these culverts such as diameter sizes, total lengths, geographical location, and site access can be found in Appendix B. Details regarding the project and the culverts requiring Services will also be discussed in a mandatory site visit, prior to commencement of Services. Services under this Contract will generally constitute: supply and replacement of culverts, which will include removal of old culverts, flap and/or screw/slide gates, disposal or salvage of old culverts off site, excavation, bedding material, backfilling with minimum 95% compaction, and/or installation of flap gates screw/slide gates, as directed. The scope of work for this project includes, but is not limited to, the following: (1) Supplying, replacing, and installing ten (10) culverts by earth excavation, in accordance with the provided standard drawing "S-1418-20: Installation of CSP and SPCSP Structures", at ten (10) locations that will be identified by AGI staff during the mandatory pre-bid site visit and also in figures in Appendix B; (2) Stripping, excavating, grading, and/or backfilling channel dykes and surrounding area. Any disturbed areas requiring backfilling must be done at the standard side slopes, in accordance with the provided standard drawing "18-13: Cross Drain Structure" to match the existing dykes, or as directed by AGI staff; (3) Armoring the downstream end of the installed culverts with Class 1 rip-rap (which may also include non-woven geotextile fabric), in accordance with the provided standard drawing "S-1418-20: Installation of CSP and SPCSP Structures"; (4) Replacing all culvert flap gates and removing all screw gates, if present, for all culverts installed, as directed by AGI staff; (5) Undertaking best management practices to ensure effective environmental management and care for water at the work site by preventing the release of any deleterious substance into the water or the general environment; (6) Providing effective erosion control measures (silt fencing, etc.) if required; (7) Providing list of equipment, materials, manpower, and work methodology needed to complete the Services; (8) The Province holds maintenance approval rights under the water act; however, the Proponent may be required to obtain and secure additional permits to commence and complete the Services. Unless otherwise specified, the Proponent shall supply all materials necessary to complete the Services. A complete job is called for, therefore, any labour, material, equipment, tools, or incidental item not specifically mentioned, but necessary for completeness will be considered incidental to the Services, and no separate or additional payment will be made.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.