Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

November 18, 2024

April 17, 2025

To Be Determined

Renovation

No Information to Display

$300,000.00

Public - City

img_map_placeholder

To Be Determined, Hertford, NC

12

23

3

Subscribe to View Full Documents

Hertford Collections System Improvements - WWTP Improvements Project. Description: The project covers replacement (like-for-like) of the electrical and mechanical components at the Wastewater Treatment Plant (WWTP) headworks, which includes replacement of the automatic bar screens, manual bar screens, grit removal system, control panels, and updates to the supervisory control and data acquisition (SCADA) system. Question Deadline 10/10/2024 at 5:00 PM ET WORK TO BE DONE A. The project covers replacement (like-for-like) of the electrical and mechanical components at the Wastewater Treatment Plant (WWTP) headworks, which includes replacement of the automatic bar screens, manual bar screens, grit removal system, control panels, and updates to the supervisory control and data acquisition (SCADA) system. B. Provide all labor, materials, equipment, tools, services, and incidentals necessary to complete all work required by the Contract Documents to furnish and install all work as shown on the Drawings and specified herein. C. Complete the Work, in place, tested, and ready for continuous service. Perform or provide repairs, replacements, and restoration required as a result of damages resulting from construction operations. D. Furnish and install all materials, equipment, and incidentals, which are reasonably and properly inferable and necessary for the proper completion of the Work, whether specifically indicated in the Contract Documents, or not.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects