Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 3, 2024
November 4, 2024
March 4, 2025
1991 E White House Canyon Rd
Renovation
No Information to Display
$300,000.00
Public - City
1991 E White House Canyon Rd, Sahuarita, AZ
Campus - Wide Improvements at their Elementary School Question Deadline 09/24/2024 at 3:00 PM MT Summary of the Work 5.1 Roofing scope involves roofing work at the following buildings on the Continental Elementary School Campus: SFB #1003, SFB #1009, SFB #1010, SFB #1011 SFB #1012 and 1013. 5.1.1 Test, repair, clean, prep and paint existing metal downspouts. 5.1.2 Intercept existing roof drain conductors from the roof drains of building #1003. Install new primary roof drain leaders, extend across lower west building roof and down west wall to new sidewalk scuppers. Install new secondary roof drain leaders at gymnasium roof and extend to discharge through west gymnasium wall above lower west building roof. 5.1.3 Prepare, spot prime and paint all steel including metal trim and exposed flashings. Back prime all new steel. Do not paint factory finished metal. 5.1.4 Provide third party testing to conduct roof pull tests. 5.1.5 Repair, prepare and prime existing roof surface. Cut out and repair damaged areas. Apply new seamless roof coating system to entire roof surface. 5.1.6 Remove existing sheet metal parapet coping as indicated on drawings. Install new sheet metal parapet coping per drawings and specification. 5.1.7 Licensed tradesperson to replace electrical whips and condensate piping with new at all roof top mechanical units in the work area. Extend condensate piping to roof gutters, downspouts or existing roof penetrations intended for this purpose. 5.1.8 Provide all new roof blocks and supports for roof mounted whips, condensate piping and utilities. 5.1.9 Appropriate trades person to modify or extend any mechanical, electrical, plumbing, cctv, telephone, antennae, sound, or lighting facilities, etc. Found to obstruct the work of this project. 5.1.10 Clean all roof and wall surfaces in work area upon completion of work.Weatherization scope involves the following: 5.2.1 Pressure wash all exterior masonry walls to remove efflorescence, discolorations, and chalking residue in preparation for application of coating. Pressure washing activities shall not cause spalling of masonry. 5.2.2 Prior to application of wall coating, patch and repair all cracks, holes, and defects in the existing masonry with masonry soaping, cementitious repair material, and/or tuckpointing where appropriate, and repair cracks with an acrylic crack sealer. At cracks larger than 1/8", use an elastomeric caulking compound designed for expansion joints. Repair materials and coating shall be compatible. 5.2.3 Prep, prime, and coat all exterior walls, full height to 3" below existing grade, including roof side of parapet walls where masonry is exposed - typical. Prior to wall coating application, excavate existing soil away from wall down to 3" below existing grade. After coating application and full curing, regrade soil to existing grade, providing positive drainage from building at all locations, typical. 5.2.4 Tape off and protect all wall mounted signage, electrical devices, light fixtures, fire alarm devices, speakers, etc. 5.2.5 Remove and replace all exterior masonry joint sealant and backer rod throughout, including masonry control joints (MCJ) and masonry expansion joints (MEJ) - typical. 5.2.6 Remove and replace perimeter sealant at all exterior hollow metal window frames as required for weathertight condition - typical. Prep and paint all exterior hollow metal window frames. 5.2.7 Remove and replace perimeter sealant at all exterior hollow metal door frames as required for weathertight condition - typical. Prep and paint all exterior hollow metal door frames. 5.2.8 Prep and paint all exterior hollow metal doors
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Sahuarita, AZ
--
Bullhead City, AZ
Bid Date: Sep 20 2024
Bullhead City, AZ
Bid Date: Sep 20 2024
Scottsdale, AZ
--
Surprise, AZ
Bid Date: Sep 05 2024
Yuma, AZ
Bid Date: Sep 30 2024
Kingman, AZ
Bid Date: Oct 03 2024
Phoenix, AZ
Bid Date: Sep 20 2024
Phoenix, AZ
Bid Date: Sep 20 2024
Phoenix, AZ
Bid Date: Sep 20 2024
DM AFB, AZ
Bid Date: Sep 20 2024
Prescott Valley, AZ
Bid Date: Sep 30 2024
Flagstaff, AZ
Bid Date: Jun 11 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
