Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

December 15, 2024

June 30, 2025

15000 Arnold Dr

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

15000 Arnold Dr, Glen Ellen, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Addendum to add additional containers to Cost Worksheet and new paragraph to Exhibit A. Sonoma Developmental Center (SDC) is seeking contractor to provide all necessary personnel, supplies, material, tools, equipment, transportation and all regulatory requirements to package and remove hazardous materials from the grounds at SDC. Contractor agrees to provide all necessary personnel, supplies, materials, tools, equipment, transportation, licenses, permits, and insurance to package and remove Hazardous Waste from the grounds of SDC. Removal services are on an as-needed basis. Agreement Term The term of this Agreement will be for 6 1/2 months with the option to amend to add one (1) additional year, add funds, and increase or decrease services as deemed necessary by SDC. The rates on Attachment 4-Cost Worksheet, will not change as a result of any amendment to this Agreement. This Agreement may be terminated by SDC with thirty (30) days' written notice to the Contractor. Contractors are cautioned that no work will begin until the Agreement has been fully executed. If work is performed prior to agreement approval, and the Agreement for any reason is not approved, all previous work performed by the Contractor is considered donated to SDC and no payment shall be made for that work. Additional pre bid meeting note: In the event a potential prime contractor is unable to attend the mandatory pre-bid conference/walkthrough, an authorized representative may attend on their behalf. The representative may only sign in for one company. Subcontractors may not represent a potential prime contractor at a non-mandatory pre-bid conference/walkthrough. For contractors that need assistance due to a physical impairment, a reasonable accommodation will be provided by the awarding agency upon request for the pre-bid conference/walkthrough. The Contractor must call Valerie Dunn at (707) 938-6113 no later than the fifth working day prior to the scheduled date and time of the pre-bid conference to arrange for a reasonable accommodation. Bidder may submit questions for clarification of the content of this IFB to Becky.Zyskowski@dds.ca.gov September 3, 2024

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.